1935 Haro Street, Vancouver, BC
A 9-storey post-tensioned concrete frame high-rise building, constructed over a below-grade reinforced concrete parking structure.  This project is currently in the constrcution stage. The remedial work includes the following: exposed windows and upper floors sliding and swing doors replacement, EIFS cladding replacement with exterior insulated drain cavity stucco system, brick veneer replacement, cast-in-place concrete walls recoating, balcony membrane replacement and roof deck and roof membrane replacement. The estimated construction value is approximately $1,500,000.
 

 
The Dunhill, 7288 Acorn Street, Burnaby, BC
A 16-storey concrete frame high-rise building, constructed over a below-grade reinforced concrete parking structure.  The remedial work included the following: replacement of the exposed face-sealed Exterior Insulated Finish System (EIFS) clad walls with exterior insulated drained cavity stucco walls (i.e. rainscreen walls), replacement of exposed aluminum punched windows and sliding doors, brick wall repairs, concrete wall maintenance work such as sealing cracks, roof membrane tie-ins repair, balcony membrane tie-ins, and balcony guard-wall replacement. The estimated construction value is approximately $3,500,000. Sam Daibess was involved with the design development, design, and construction stages while working for a competitive firm.
 
JSD Engineering - High-rise remediation JSD Engineering - High-rise remediation
 
The Evergreen, 4825 Hazel Street, Burnaby, BC
A 25-storey concrete frame high-rise building, constructed over a below-grade reinforced concrete parking structure.  The remedial work included the following: replacement of the exposed face-sealed Exterior Insulated Finish System (EIFS) clad walls with exterior insulated drained cavity stucco walls (i.e. rainscreen walls), replacement of exposed aluminum punched windows, window-walls, and sliding doors, roof membrane tie-ins repair, balcony membrane and guard-wall replacement, etc. The estimated construction value is approximately $13,000,000. Sam Daibess was involved with the design development, design, and early construction stages while working for a competitive firm.
 
JSD Engineering - High-rise remediation JSD Engineering - High-rise remediation
 
1111 Haro Street, Vancouver, BC. A
15-storey post-tensioned concrete frame high-rise building, constructed over a below-grade reinforced concrete parking structure.  The remedial work included the following: replacement the windows and sliding doors, EIFS cladding repairs around windows, roof membrane ties-ins. The estimated construction value is approximately $400,000. Sam Daibess was involved with the design development, design, and construction stages while working for a competitive firm.
 